![]() The export rate was updated on 5/1/21.īy 2025, Utah is calling for a 20% RPS. Utah Net Metering to Net Billing Transition Historyġ1/15/17 and prior : Customers that completed the interconnection application prior to 11/15/17 have 1:1 Net Metering grandfathered until under Schedule 135ġ1/15/17- 10/30/20 : Customers that completed the interconnection application between these dates are called Transition Customers, and residential customers receive a Net Billing credit of 9.2 cents per kWh sent to the grid, grandfathered until under Schedule 136ġ0/30/20 - Current : Customers are now eligible for the net billing program, Schedule 137. If not used, you will lose them, there is not compensation. ![]() October through May - I nclusive 5.487¢ per kWh for all exported kWhĬustomers are NOT locked into these rates, they can change if approved by the Public Service Commission (PSC)Įxcess credits will carry-over to the next monthly bill during the Annualized Billing Period, and appear as a cumulative kWh credit on their bill which is applied to the next months bill.Ĭustomer pays the fixed connection fee monthly, the $ credit is not applied to fixed chargesĪll unused credits accumulated by the customer-generator shall expire with the regularly scheduled meter reading at the conclusion of the Annualized Billing PeriodĪll unused credits expire in March of each year June through September - Inclusive 5.817¢ per kWh for all exported kWh Any excess generation not consumed by the home, will be sent to the grid.Įnergy sent to the grid is credited to the customer at a $ monetary value based on the following:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |